Installation Requirements

Created by Rob Warner, Modified on Wed, 9 Apr at 4:28 PM by Rob Warner

Health Station Setup & Logistics


The SiSU Health Station is set up by a certified SiSU Health Station Technician.


Installation requires access to a parking or loading bay for up to 2 hours and ramp or lift access to the chosen installation site (the station cannot be carried upstairs).


The SiSU Health Station will be constructed in the loading bay or parking area and then moved into your building using a hand-held trolley.


The Station will be placed in your preferred location (according to the above requirements)

and calibrated on-site by our technician. 


The Station cannot be relocated by the client.


Installation Criteria


• Health Station Dimensions: Width 0.8m, Depth 0.9m, Height 2.4m

• A power supply (standard power outlet)

• Strong mobile network coverage

• Flat surface

• Indoor space, protected from all weather conditions

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article